FAQs
Frequently Asked Questions
The questions we get asked most about garden landscaping.
Questions
Hard Landscaping
What does hard landscaping include?
Hard landscaping covers any fixed, structural element in a garden: patios, paving, paths, steps, retaining walls, raised edging, and drainage groundwork. These are the built surfaces and structures that shape how a garden functions, as opposed to planted or grassed areas.
How do I know if I need a patio, path or retaining wall?
A patio suits flat or near-flat ground where you want a usable outdoor surface. A path connects areas or guides foot traffic across the garden. A retaining wall is needed where ground levels change and soil needs to be held back. A site visit will confirm which applies to your garden.
What is included in the work, like a patio, wall, steps or path?
Each element is scoped individually. A patio job typically covers excavation, sub-base, bedding, and surface laying. A wall includes foundations, block or stone work, and coping. Steps involve cutting, forming, and finishing. Drainage groundwork may be included where the site requires it. Each element is quoted separately.
Will the finish suit the size and layout of my garden?
Material choice, slab size, and bond pattern all affect how a space reads. Larger format slabs can make a small garden feel more open; smaller units suit irregular shapes. Partners assess the garden’s dimensions and layout before recommending a finish, so the result is proportionate to the space.
Could the job end up costing more once it starts?
It can, if groundwork uncovers unexpected issues such as buried rubble, poor soil depth, or drainage problems not visible before digging. Each element is quoted separately upfront, so you know the baseline cost before work begins. Any additional scope is flagged before it is carried out.
What happens if the wall, path or patio is built badly?
Poor construction leads to sinking slabs, cracking mortar, leaning walls, and pooling water. Fixing these faults means lifting the surface, correcting the sub-base, and relaying, which costs significantly more than getting it right first time. Choosing a vetted partner with a clear written scope reduces this risk considerably.
Questions
Patios & Paving
Why does my patio keep sinking or moving?
Sinking or shifting paving almost always points to a failed sub-base. If the hardcore layer beneath the slabs or blocks was too shallow, poorly compacted, or laid over unstable soil, it breaks down under load and foot traffic. Clay-heavy ground that swells and shrinks with moisture makes this worse. Proper excavation and a compacted MOT Type 1 sub-base are what prevent it.
Is block paving or slabs better for my patio?
Slabs suit most domestic patios: they lay faster, cost less per square metre, and give a clean, low-maintenance finish. Block paving is better where you want a traditional or intricate pattern, or where the surface will take vehicle weight. For a straightforward garden patio, large-format slabs in porcelain or natural stone are usually the more practical choice.
What type of slab or block will suit my space best?
Porcelain slabs are frost-proof, low-maintenance, and suit modern gardens. Natural stone such as sandstone or limestone suits traditional or cottage-style plots but needs sealing. Concrete slabs are cost-effective for larger areas. Block paving in clay or concrete suits driveways and period properties. The right choice depends on your house style, budget, and how the space will be used.
Will this be suitable for a patio, path, or driveway?
Most paving materials work across all three uses, but the sub-base depth and bedding method change. A driveway needs a deeper MOT sub-base and thicker blocks or slabs rated for vehicle load. A path needs a stable but shallower base. A patio sits between the two. The right specification is confirmed once the intended use and ground conditions are assessed.
Do I need planning permission for my driveway or paved area?
For a front driveway over 5 square metres, permitted development rules require the surface to drain naturally, either permeable paving or drainage directed to a lawn or border. If it drains to the road or a soakaway, planning permission is needed. Rear patios and garden areas are not normally subject to the same rules, but listed buildings and conservation areas are exceptions.
What affects the cost of paving a driveway or patio?
Area size, material choice, and sub-base depth are the main factors. Porcelain and natural stone cost more per square metre than concrete slabs or standard block paving. Ground conditions matter too, soft or clay-heavy soil needs deeper excavation and more hardcore. Access, pattern complexity, and any drainage work are each quoted as separate items.
Questions
Garden Design & Planning
Will this garden design suit the way I actually use the space?
Yes, a good design starts with how you use the space, not just how it looks. A designer will ask about foot traffic, children, pets, entertaining, and storage before drawing anything. The layout, surface choices, and planting are then built around those answers, not applied generically.
How do I know the layout will work for my garden’s size and shape?
The garden is measured accurately before any layout is drawn, so proportions are based on real dimensions. Awkward shapes, narrow side returns, and sloped or irregular boundaries are mapped and worked into the plan rather than ignored. A scaled drawing lets you see exactly how each zone fits before any work begins.
What should be checked before you draw the design?
Measurements, soil type, drainage, aspect, existing features worth keeping, and how you use the space all need checking first. Boundary positions, overhead cables, and underground services may also need confirming. Skipping any of these can mean a plan that looks good on paper but causes problems on site.
Can a garden design show exactly what goes where?
Yes. A scaled plan shows the precise position of hard surfaces, planting areas, paths, structures, and features. Dimensions are included so contractors can price and build from the drawing without guessing. Some plans also include cross-sections or 3D visuals to show levels and planting heights.
Do I need a full garden rebuild to use a design plan?
No. A design plan can cover a single zone, a phased improvement, or a full rebuild equally well. Many homeowners use a plan to guide work they carry out over several years, tackling one area at a time while keeping the overall layout consistent.
Is it worth getting a garden designer for my garden?
It is worth it when the cost of getting the layout wrong exceeds the design fee. Repositioning a patio, rerouting a path, or removing poorly placed planting after the fact costs far more than planning it correctly upfront. A design also gives contractors a clear brief, which reduces the chance of misunderstandings.
Questions
Turfing & Lawns
How much does turfing my lawn cost?
Most turfing jobs come in at £600-£1,400, depending on the size of the area, soil condition, and how much preparation is needed. Turf is quoted as a separate item, so you get a clear figure for the lawn work alone.
What affects the cost of turfing my lawn?
The main factors are the total area, the amount of ground preparation required, whether old grass needs stripping, and how much levelling the site needs. Each of these is assessed and quoted separately, so you can see exactly what you are paying for.
Can I get a new lawn laid on my existing soil, or does it need more preparation?
It depends on the soil condition. Compacted, stony, or heavily weeded ground needs breaking up, clearing, and often topping with a layer of topsoil before turf will establish properly. Laying directly onto unprepared soil risks poor rooting and an uneven finish.
What month is best for laying turf?
September to November and March to April are the most reliable windows. Cooler temperatures and natural rainfall reduce the watering burden and help roots establish before summer heat or winter frost arrive.
What happens when you lay new turf?
The existing vegetation is stripped, the soil is broken up and levelled, and a layer of topsoil is added where needed. Turf rolls are then laid in a staggered brick-bond pattern, pressed firmly to the soil, and the edges are cut neatly to the border.
Will turf last if it is laid badly?
No. Turf laid on poorly prepared soil, with air pockets beneath it, or without adequate watering in the first weeks will fail to root and will die back. Correct ground preparation is what determines whether the lawn lasts, not the turf quality alone.
Questions
Artificial Grass
How much should I expect artificial grass to cost for my garden?
Most residential artificial grass installations come in at £65-£80, depending on the size of the area, the pile height and density of the product chosen, and the amount of groundwork required. Larger gardens with uneven ground or poor drainage will sit toward the top of that range.
What affects the cost of artificial grass fitting?
The main factors are the square meterage, the grade of grass chosen, and the condition of the ground underneath. Removing an existing lawn, adding a sub-base, installing drainage, or cutting around complex shapes all add to the total. A flat, clear garden with straightforward access will cost less than one that needs significant preparation.
Will I be charged extra for groundwork, edging, or taking away the waste?
These items are quoted separately rather than bundled into a single price. Groundwork, edging, and waste removal each carry their own cost, so you see exactly what you are paying for. Ask for a line-by-line breakdown when you request a quote.
Is artificial grass a good choice for my pets?
Yes, for most pets it works well. A product with good drainage allows urine to pass through rather than pool on the surface. Solid waste lifts away cleanly, and the surface does not turn muddy or patchy the way natural turf does under heavy paw traffic. Rinsing with water keeps it fresh.
Will it look natural once it is fitted, or will it look fake?
A good-quality product with a mixed-tone, multi-directional pile reads as natural from a normal viewing distance. Cheaper single-colour grass with a uniform pile direction is what gives artificial lawns a plastic appearance. Correct fitting, neat edging, and a proper sub-base also make a significant difference to the finished look.
What preparation is needed before artificial grass can be fitted?
The existing lawn or surface is removed, the ground is levelled, and a compacted sub-base of crushed aggregate is laid to provide stability and drainage. A weed-suppressing membrane goes down before the grass is laid and secured. On poorly draining ground, additional drainage work is carried out first.
Questions
Fencing & Gates
Why does my gate keep sagging or sticking?
Sagging usually means a hinge has worked loose or the post it hangs from has shifted in the ground. Sticking is often the same cause, or the gate has swollen with moisture and is catching the frame. Check the post first, if it rocks at all, the hinge adjustment alone will not hold.
Will I need new posts or hinges for a new fence or gate?
It depends on the condition of what is already there. Sound, plumb posts can often be reused; posts that are rotted below ground, cracked, or out of line need replacing. Hinges are usually swapped when fitting a new gate, as worn hardware causes problems quickly on a new installation.
Can you fit the gate and supply it as well?
Yes. Our partners can supply and fit gates, sourcing the right size and style for your opening. Supply-and-fit is quoted as a single item, so you know the full cost upfront rather than managing separate suppliers.
How much would it cost to get a fence put up?
Fencing is quoted separately from other landscaping work, so you get a clear figure for that element alone. Most installations come in at £120-£280, varying with run length, panel style, and whether new posts are needed.
What makes a gate installation cost more?
Wide openings, heavy gates, and automated or electric mechanisms all add to the cost. New concrete post foundations, difficult ground, or a sloped threshold also increase the price. A gate on an existing sound post with standard hinges sits at the lower end of £120-£280.
Do I need a new fence if only one panel is damaged?
No, a single damaged panel can usually be replaced without touching the rest of the fence. The deciding factor is the posts: if the posts either side of the damaged panel are solid and upright, a panel swap is straightforward. Rotted or leaning posts mean more work regardless of panel condition.
Questions
Decking
How much does it cost to have decking fitted?
Most decking installations come in at £1,200-£1,600, depending on the size of the area, the material chosen and the complexity of the frame. Composite boards cost more upfront than treated softwood but need less ongoing maintenance. A larger or raised deck with steps will sit at the higher end of that range.
What affects the price of getting decking fitted?
The main factors are the deck’s footprint, the board material (softwood, hardwood or composite), and how much groundwork the frame needs. Sloping or uneven ground requires more substantial subframe work, which adds to the cost. Steps, balustrades and any drainage work underneath are quoted separately.
Is composite decking better than wood decking?
Composite decking resists rot, fading and splintering without annual oiling or staining, making it lower maintenance than treated softwood. Softwood costs less upfront but needs regular treatment to stay sound. Hardwood sits between the two, durable and attractive, but it still requires periodic oiling to maintain its appearance.
Can a deck be fitted on an existing patio or uneven ground?
Yes, decking can be laid over a solid existing patio using a treated timber or composite subframe to create a level surface. On uneven ground, adjustable feet or deeper posts are used to level the frame before boards go down. The key requirement is that the subframe is stable and properly ventilated underneath.
Do you guarantee the work if something goes wrong?
Guarantee terms vary by partner and are confirmed in writing before work starts. Ask for the specific guarantee period and what it covers, workmanship and materials are the two areas to check. Any guarantee should be provided in writing so you have a clear record if a problem arises.
Are you insured for decking work?
The independent partners we connect customers with carry their own public liability insurance. Confirm the level of cover with your partner before work begins, and ask to see their certificate if you want reassurance. Never allow work to start without confirming insurance is in place.
Questions
Raised Beds & Planting
Will my raised bed drain properly, or could the plants fail because it stays too wet?
A correctly built raised bed drains freely because it sits above the surrounding ground level and uses an open-bottomed or perforated base with free-draining growing medium. The site is checked before building to identify any underlying drainage issues. If the ground beneath holds water, that is addressed before the bed goes in, so roots are not sitting in saturated soil.
Do raised beds need special soil, or can you use the soil that is already there?
Raised beds need a fresh growing medium, not the existing ground soil. Native soil is often too compacted, poorly structured, or contaminated with weed seed to use directly. A mix of topsoil and organic matter is used instead, giving roots the structure and nutrition they need from day one.
Can you build and plant the raised bed in one visit, or do they need to be done separately?
Build and planting can happen in a single visit when the site is ready and plants have been agreed in advance. If the ground needs preparation first, a second visit may be needed once that work has settled. The plan is confirmed at the quotation stage so there are no surprises on the day.
What kind of site checks do you do before building a raised bed?
The site is assessed for level, drainage, access, and any obstructions such as tree roots or buried services. Light levels and aspect are noted to inform planting choices. Any ground that is waterlogged, heavily compacted, or steeply sloped is flagged before work begins so the build accounts for it.
How much site preparation will my garden need before the raised beds go in?
It varies by site. A flat, clear area needs minimal preparation beyond marking out and levelling. Overgrown ground, heavy weed cover, or poor drainage will need clearing and remediation first. The site check identifies what is needed, and any preparation work is quoted separately so you know the full scope before committing.
Will the planting suit the light and space I actually have?
Yes. Plant selection is based on the aspect, shade levels, and bed dimensions of your specific garden. A south-facing bed in full sun gets different plants to a north-facing or partially shaded one. Nothing is planted speculatively; the choices are matched to the conditions that exist on your plot.
Questions
Garden Walls & Retaining Walls
How much does a garden retaining wall cost?
Most retaining wall projects come in at £800-£2,000, depending on wall height, length, material, and whether drainage groundwork is needed. A short decorative garden wall costs considerably less than a structural retaining wall holding back a significant slope. Getting a site-specific quote is the only way to get an accurate figure.
What is the cheapest way to build a retaining wall?
Concrete block or treated timber sleepers are typically the lowest-cost options for a retaining wall. Sleepers suit informal gardens and go up quickly; concrete block suits taller or longer runs where structural strength matters. Both still require proper footings and drainage to function correctly.
Do I need planning permission for a retaining wall in my garden?
Most garden retaining walls fall under permitted development and do not need planning permission, provided they are under one metre high adjacent to a highway or under two metres elsewhere. Walls that exceed those heights, or that sit within a conservation area or listed building curtilage, will need consent. Always check with your local planning authority before starting.
Will I need approval if my retaining wall is near a road or path?
Yes. Any wall within two metres of a highway, including a public footpath, is limited to one metre in height under permitted development rules. Above that, you need planning permission. If the wall also affects a public right of way or highway drainage, the local authority highways team may also need to be notified.
Do retaining walls need drainage?
Yes, drainage behind a retaining wall is essential. Without it, water pressure builds up in the retained soil, which is the most common cause of wall movement and eventual failure. A correctly built wall includes a free-draining aggregate backfill and weep holes or a perforated drain pipe to release water safely.
How do I know which wall type is right for my soil and slope?
The right wall type depends on the height of the slope, the soil type, and how much lateral pressure the wall needs to resist. Clay soils that swell when wet need deeper footings and more robust drainage than sandy or loamy ground. A site visit and ground assessment before quoting determines the correct specification.
Questions
Garden Paths & Driveways
Do I need a new driveway or can mine just be repaired?
Repair works when damage is isolated, a few cracked slabs, a sunken section, or loose edging. If the base has failed, water is pooling across the surface, or more than a third of the area is affected, a full replacement will outlast any patch. Repairing a failed base costs more in the long run than starting again.
How do I know if my path or driveway needs digging out and starting again?
The clearest signs are widespread cracking, surface that rocks underfoot, persistent puddles after rain, and edges that have spread or collapsed. Any of these usually means the sub-base has failed, not just the surface. Relaying the top layer without addressing the base will produce the same problems within a season or two.
What surface options are there for a garden path or driveway?
Common options include block paving, natural stone flags, resin-bound gravel, loose gravel, tarmac, concrete, and porcelain. Each varies in cost, drainage performance, maintenance, and appearance. Block paving and resin-bound surfaces are popular for driveways; natural stone and porcelain suit garden paths where aesthetics matter most.
Is gravel a good option for my driveway or path?
Gravel drains freely, costs less than bound surfaces, and suits most plot sizes. The drawbacks are that it migrates onto lawns and roads, needs raking back periodically, and can be difficult to walk on in heels or with a pushchair. A geotextile membrane beneath and edging restraints on all sides reduce migration significantly.
Will a new driveway stop puddles or water collecting?
Yes, provided the sub-base is graded correctly and drainage is built in from the start. Puddles form when the base is uneven or the surface has no fall. A properly laid driveway directs water to a channel drain, soakaway, or permeable surface rather than letting it sit.
How well will a new path or driveway drain?
Drainage performance depends on the surface type and the sub-base design. Resin-bound and loose gravel drain through the surface itself. Block paving and flags need a fall of at least 1:60 toward a drain or channel. A correctly specified sub-base prevents water from sitting beneath the surface and causing frost damage or settlement.
Questions
Garden Drainage & Groundwork
Why is water pooling in my garden?
Water pools when the ground cannot absorb or move rainfall away fast enough. The most common causes are compacted soil, a high clay content, low-lying ground, or a blocked natural outlet. Without intervention, the standing water will persist and worsen over time as the soil structure deteriorates further.
Do I need drainage before I lay a patio or new lawn?
Yes, if the ground holds water. Laying a patio or turf over waterlogged ground leads to slab movement, root rot, and moss within a season. Sorting drainage and ground preparation first means the finished surface performs as it should and lasts far longer.
Can a French drain fix a wet garden?
A French drain works well when water is entering from a specific direction or collecting along a boundary. It intercepts and redirects water through a perforated pipe bedded in gravel. Where the whole plot is waterlogged due to clay or compaction, a French drain alone is rarely enough and a wider drainage scheme is needed.
Will the work cover both drainage and ground preparation?
Yes. Drainage installation and ground preparation are handled together so the site is ready for whatever comes next, whether that is turf, paving, or planting. Each element is quoted separately so you can see exactly what each part of the work costs.
Is this suitable for the whole garden or just one damp area?
Both. A single damp patch can be targeted with a localised soakaway or channel drain. A garden that holds water across most of its area needs a full drainage layout. The right scope is confirmed once the site has been assessed.
Will the ground be levelled and prepared for the next job?
Yes. Groundwork includes levelling and consolidating the surface so it is ready for the next stage, whether that is laying turf, installing a patio, or another landscaping job. The ground is left stable and graded to fall correctly.
Questions
Garden Makeovers & Full Renovations
Do I need a full garden renovation, or would a smaller update be enough for my garden?
A full renovation makes sense when multiple elements are failing together, poor drainage, broken paving, and bare or overgrown planting. If only one area is the problem, a targeted update may be enough. A site visit will show whether the issues are isolated or connected underneath.
What is included in a full garden makeover?
A full makeover typically covers clearance of the existing garden, groundwork and drainage, hard landscaping such as patios and paths, lawn or planting installation, and fencing or boundary work. Each element is scoped and quoted separately so you can see exactly what you are paying for.
Can you redesign the whole garden, not just one part of it?
Yes. Partners can take on the full plot from boundary to boundary, covering layout, levels, hard surfaces, planting, and finishing. A whole-garden approach means every element is designed to work together rather than added piecemeal.
Will a garden makeover help if my garden has slopes, uneven levels, or drainage problems?
Yes, and these issues are best tackled as part of a renovation rather than after it. Regrading levels, installing drainage runs, and building retaining structures are groundwork tasks that need to happen before paving or planting goes in. Leaving them unresolved means the finished garden will still fail.
Can you sort out the layout, paving, planting, and finishing as part of one job?
Yes. All of those elements can be managed as a single project. Each trade area, paving, drainage, turf, planting, fencing, is quoted as a separate line so you know the cost breakdown, but the work is coordinated and sequenced as one job.
How much will it cost if the old garden needs more work once it is lifted?
Hidden problems such as failed drainage, poor subbase, or contaminated soil can add cost once the existing surface is lifted. Partners will flag anything found during groundwork before proceeding, so you can agree any changes rather than face an unexpected bill at the end.
Questions
Problems & Symptoms
Will my garden need better drainage because the ground holds water after rain here?
Waterlogging after rain usually means the existing drainage is inadequate or the ground levels direct water to a low point. A site assessment will identify the cause. French drains, soakaways, or regrading can resolve most cases before any hard or soft landscaping is laid. See garden drainage options for more detail.
Questions
Cost & Pricing
How much does garden landscaping usually cost?
Most garden landscaping projects come in at £1,500-£4,000, depending on the size of the plot, the materials chosen, and how many elements are included. A simple lawn and border refresh sits at the lower end; full redesigns with paving, drainage, and planting sit higher.
What affects the cost of landscaping my garden?
Plot size, ground conditions, and the number of elements involved have the biggest effect on cost. Paving, paths, turf, fencing, drainage, and planting are each quoted separately, so you can see exactly what each part costs and adjust the scope to fit your budget.
Can I get a quote before I decide what to have done?
Yes. Each element, patio, paths, turf, fencing, drainage, planting, is quoted as a separate line, so you can review the breakdown and decide which parts to go ahead with. There is no obligation to commit to the full scope after receiving a quote.
Questions
Is It Right for You?
Can you just improve part of the garden, or does it need a full redesign?
Partial improvements are straightforward. A single patio, a new path, or a replanted border can be done without touching the rest of the garden. A full redesign only makes sense when multiple elements are outdated or when ground conditions need addressing across the whole plot.
Will the design suit the size and shape of my garden?
Yes. Our partners assess the actual dimensions and shape of your plot before proposing anything. Narrow plots, awkward corners, and irregular boundaries all influence the layout, and the design is drawn around what the space can realistically accommodate.
Will the design suit the front of my house as well as the garden?
Front gardens can be landscaped to match the rear in style and materials. Kerb appeal, access, and any permitted development rules for front boundary treatments are all considered when planning the work. Both areas can be quoted and designed together or separately.
I do not know what style I want yet, can you help me decide?
Yes. Our partners discuss how you use the garden, your maintenance preferences, and the character of the property before suggesting a direction. You are not expected to arrive with a brief, that conversation is part of the design and planning process.
Is this type of garden landscaping suitable for a clay-heavy plot in Peterborough?
Yes, but clay ground needs preparation. It compacts, holds water, and moves with temperature changes, which affects foundations for patios and walls. Our partners account for this by improving sub-base depth and drainage before laying any hard surfaces or establishing planting.
Questions
Comparing Your Options
Is the cheapest way to landscape a garden just to do it in stages?
Phasing can spread cost, but it is not always cheaper overall. Groundwork done twice, or paths laid before drainage is resolved, adds labour. A clear plan from the start means each stage builds on the last without undoing previous work.
Should I do the work myself or get a landscape gardener in?
DIY suits small, surface-level jobs like planting or mulching. Anything involving ground levels, drainage, retaining walls, or hard surfaces benefits from a landscaper: errors in these areas are costly to fix and can cause ongoing water or structural problems.
What is the difference between a gardener and a landscape gardener?
A gardener maintains an existing garden, mowing, pruning, weeding. A landscape gardener changes the structure: laying patios, building walls, installing drainage, reshaping levels, and planting to a design. The two roles overlap only at the planting stage.
Questions
How It Works
What does garden landscaping include?
It covers any work that changes the layout or structure of a garden. That includes hard landscaping such as patios, paths, and walls, as well as soft landscaping like turfing, raised beds, and planting, plus groundwork elements such as drainage and levelling.
Will garden landscaping make my garden hard to look after?
Not if low maintenance is a stated priority. Hard surfaces, gravel, artificial grass, and structural planting all reduce ongoing upkeep. Our partners can design around the amount of time you want to spend, so the finished garden suits your routine, not just your eye.
How tidy will the finished garden be?
All waste, spoil, and materials are cleared before the job is signed off. Edges are finished, surfaces are cleaned down, and any disturbed areas outside the work zone are reinstated. The garden should be usable the day the team leaves.
How much disruption will the work cause at home?
Hard landscaping and groundwork generate the most disruption, machinery, spoil removal, and temporary loss of access to parts of the garden. Soft landscaping such as turfing and planting is far less intrusive. Our partners will tell you what to expect before work starts.
How quickly can the work start?
Start dates depend on the partner’s current schedule and the complexity of your project. Straightforward jobs can sometimes begin within a few weeks of agreeing the quote; larger projects with design and groundwork stages may need longer to plan and schedule properly.
How long does garden landscaping usually take?
A single element such as a patio or new lawn typically takes two to five days. A full garden makeover covering hard landscaping, drainage, and planting can run to two or three weeks. Your partner will give a project-specific timeline before work begins.
Do you handle planting, borders and paths, or just one part of the job?
Our partners handle the full scope: hard surfaces such as paths and patios, structural elements like walls and fencing, and soft landscaping including borders, raised beds, and planting. Each element is quoted separately so you can choose exactly what is included.
How do you handle garden landscaping on a flat, low-lying plot that gets wet in autumn?
Flat, low-lying plots common around Peterborough often need drainage installed before other work begins. Options include French drains, channel drainage along hard surfaces, or a soakaway where ground conditions allow. Resolving water movement first protects every other element of the landscaping. See drainage and groundwork for more.
Are you a landscaping contractor?
No. Peterborough Landscaping is a lead-generation brand. We take your enquiry and arrange a local independent landscaper to survey your plot and quote the work. We do not employ crews, hold a yard or carry out any work directly.
Why is the quote broken into separate items?
A combined figure hides what each element costs. Separate line items for patio, paths, turf, fencing, drainage and planting let you see exactly what is included, compare costs, and remove or phase elements without renegotiating the whole job.
Why does the landscaper need to visit before quoting?
Ground conditions vary plot to plot. Compacted made ground and fen clay both need different drainage solutions. A site visit confirms levels, soil type and drainage requirements so the quote reflects actual conditions, not a standard rate.
What areas do you cover?
We arrange landscapers across Peterborough and its surrounding areas, including Hampton, Werrington, Bretton, Stanground and Orton. Tell us your postcode when you enquire and we will confirm coverage.
What happens if drainage is not addressed before laying a patio?
Water sits on compacted sub-base and undermines the bedding layer. Paving slabs shift and sink, pointing cracks, and the surface becomes uneven. Relaying a sunken patio costs more than installing drainage before the first slab goes down.
Do I need to sort drainage before anything else can be done?
Yes, if water pools on the lawn or patio after rain. Laying turf or paving over a drainage problem means lifting it again once the water reveals itself. The landscaper surveys drainage and levels before quoting, so any groundwork needed is included in the scope from the start rather than added later.
Will the quote change once the old surface is lifted?
The ground survey before quoting is specifically to reduce that risk. Drainage, levels, and soil conditions are checked first so the price reflects what the site actually needs. If something unexpected appears once excavation starts, it is raised before any additional work proceeds.
Do I need a full redesign if I only want the front garden improved?
No. A front garden can often be improved with targeted changes: new planting, edging, a path, or a tidier layout around the entrance. The scope depends on how much change you want and how much space is available. An itemised quote lets you choose which elements to include.
Will a landscaped garden be hard to maintain afterwards?
Not if the design uses low-maintenance planting, defined border edging, and mulch to suppress weeds. Choosing plants suited to the soil type and available light is the key factor. That decision is made at the design and planning stage, before any materials are ordered.
Is it worth doing the whole garden at once or tackling it in stages?
Drainage and groundwork should come first regardless, because retrofitting them after surfaces are laid means lifting finished work. Beyond that, an itemised quote lets you see the full scope and decide which elements to include now and which to phase later, without losing the overall plan.
Questions
Guarantees & Peace of Mind
How do I choose a landscape gardener?
Ask to see completed projects similar to yours, confirm they carry public liability insurance, and get a written quote that breaks down each element. A landscaper who separates costs by task, paving, drainage, planting, gives you a clearer picture than one who quotes a single lump sum.
Are you insured if something goes wrong?
We connect customers with vetted independent local partners, and we require them to carry public liability insurance. Confirm the level of cover with your assigned partner before work starts, and ask to see their certificate if you want written confirmation.
Do you give any guarantee on the work?
Guarantee terms vary by partner and by the type of work carried out. Ask your partner directly what is covered and for how long before you confirm the job. Any guarantee should be confirmed in writing as part of the agreement.