Boards on a Bad Frame
Fitting new boards over a rotten or uneven subframe means the deck moves, squeaks, and fails within a season.
Frame Inspection First
A site visit checks joist condition and ground levels before any boards are ordered or priced.
Garden Decking
A level, safe outdoor surface, built on a correct subframe with the material and finish that suits your garden.
Done Right
The most common failures come from skipping the frame, not from the boards themselves.
Fitting new boards over a rotten or uneven subframe means the deck moves, squeaks, and fails within a season.
A site visit checks joist condition and ground levels before any boards are ordered or priced.
Composite boards need 400 mm joist centres; softwood allows 600 mm. Using the wrong spacing causes flex and cracking.
The subframe specification is set once the board material is confirmed, not built to a generic standard.
Smooth-faced boards become hazardous after rain or moss growth, a real concern through wet East Midlands winters.
Composite boards with a grooved surface profile and slip-resistant finishing are specified where grip matters.
Quoting boards only, then adding groundwork and frame costs mid-job, leaves customers with an unpredictable final bill.
Subframe, boards, fixings, fascia, and steps are quoted together as one clear scope before work begins.
Scope of Work
From a straightforward board replacement to a raised deck with steps, each element is quoted as a separate line.
Composite or timber boards on a levelled joist frame, including subframe and fixings.
Wood fibre and polymer boards, no annual treatment needed.
Traditional timber boards in softwood or hardwood grades.
New joist frame built to the board manufacturer’s spacing spec.
Raised platform and integrated steps for step-down gardens.
Perimeter fascia for a clean, finished edge to the frame.
Full subframe removal and rebuild where the existing frame has failed.
Why Us
Local landscapers who survey the ground, confirm the scope, and quote every element before work begins.
Subframe, boards, fixings, fascia, and steps are each quoted separately, no hidden additions mid-job.
Ground levels and existing frame condition are checked in person before any figure is given.
The frame specification is only finalised once composite or timber has been agreed with you.
Old boards, waste timber, and packaging are cleared from site at the end of the job.
Partners are familiar with step-down Peterborough gardens and the raised frame builds they require.
The Process
01
Tell us the deck size, ground condition, and whether you want composite or timber boards.
02
A local landscaper visits to check levels, inspect the frame, and return an itemised quote.
03
Subframe, boards, fascia, and steps are fitted, then all waste is removed from site.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Softwood decking | £80-£120 per m² |
| Composite decking | £90-£250 per m² |
| Small decking project | £1,200-£1,600 |
| Typical decking project | £1,500-£15,000 |
Describe the space, the ground and how you want to use it. We’ll arrange a local landscaper to survey and quote each element separately.