Drainage Ignored
Laying paving or turf over unprepared ground means water pools on the surface within one wet season.
Drainage Built In
Drainage trenches and soakaways are installed during groundworks, before any surface material goes down.
Full Renovation
From overgrown or uneven ground to a finished, usable outdoor space with drainage, paving, turf and planting in place.
Done Right
Skipping groundwork stages creates problems that surface work cannot fix.
Laying paving or turf over unprepared ground means water pools on the surface within one wet season.
Drainage trenches and soakaways are installed during groundworks, before any surface material goes down.
Starting surface work without a level survey means patios and lawns settle unevenly and need lifting again.
A site level check sets the finished heights for every element before clearance or groundworks begin.
Adding new turf or paving over a broken layout leaves the structural problems in place and the space still awkward.
Clearance removes the existing layout entirely so groundworks and new surfaces start from a prepared base.
Fitting fence panels before groundworks are complete risks post movement and panel damage during excavation.
Fencing and timber features are fitted last, once groundworks and paving are finished and levels are fixed.
Scope of Work
Each stage is quoted as a separate line so you can see the full scope and phase what is not needed immediately.
Removal of overgrown planting, broken paving, old timber, and debris to leave a clean working site.
Excavation, drainage trenches, soakaways, and ground levelling to the finished heights the new layout requires.
Paving slabs, paths, steps, and retaining features installed on a compacted sub-base to correct falls.
Topsoil preparation, turf laying, border planting, raised beds, and mulching once hard elements are set.
Fence panels, gravel boards, concrete posts, and timber features fitted after groundworks are complete.
Level changes and retaining features to make sloped ground usable.
Full layout from bare, poorly graded ground after handover.
Gravel, sleepers, and hard surfaces to reduce ongoing upkeep.
Safe, built-in steps between patio, lawn, and planting areas.
The Process
Tell us about the ground, the layout, and how you want to use the space once it is finished.
A site visit checks levels and drainage, then returns a quote with each element listed separately.
Work runs in sequence, clearance, groundworks, hard landscaping, soft landscaping, then fencing and finishing.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Small garden makeover | £4,000-£8,000 |
| Medium garden makeover | £8,000-£15,000 |
| Large full renovation | £20,000-£50,000 |
Describe the space, the ground, and how you want to use it. We’ll schedule a survey and return a clear, itemised quote covering every part of the job.
Get a Quote